Gemini Generated Image Hubkjmhubkjmhubk 2 1024x585

Implementation of Lockout tagout System

Our Lockout-Tagout (LOTO) Implementation ensures that machines and energy-powered equipment are safely isolated during servicing, maintenance, setup, or cleaning. This prevents accidental startup, release of stored energy, and unexpected machine motion — significantly reducing workplace accidents.

Our LOTO Implementation

  • Annual review & re-validation support
  • Identification of all energy sources
    (electrical, mechanical, hydraulic, pneumatic, thermal, chemical, gravity, stored energy)
  • Development of standardized LOTO procedures for each machine
  • Supply & installation of LOTO hardware devices
  • LOTO station board design & setup
  • Safety padlocks, tags, hasps, valve & switch lockouts
  • Training for operators, maintenance & safety teams
  • Compliance documentation & audit readiness
  • Visual instruction charts near machines
E Stop Switch With Label

Benefits of LOTO Implementation

  • Prevents machine startup accidents
  • Eliminates risk of electrical & mechanical energy release
  • Protects maintenance & cleaning personnel
  • Reduces workplace injuries & fatalities
  • Improves compliance & audit capability
  • Builds strong safety culture and worker confidence
  • Supports ISO & customer safety audits

Safety Standards We Follow

  • IS / Factory Safety Act compliance
  • OSHA 29 CFR 1910.147 – LOTO Regulation
  • ISO 14118 / EN 1037 – Prevention of unexpected startup

Our Key Steps in LOTO Program Execution

  1. Survey & Energy Source Mapping
    On-site study of machines and power systems
  2. Risk Identification & Isolation Planning
    Determine lock points and isolation sequence
  3. LOTO SOP Creation
    Machine-wise written procedures with visuals
  4. Procurement & Supply of Lockout Devices
    Certified industrial grade lockout kits
  5. Installation of LOTO Stations & Accessories
    Wall-mounted, machine-side, and portable stations
  6. Training & Certification
    Hands-on training for authorized and affected workers
  7. Testing, Audit & Compliance Verification
    Ensure implementation meets OSHA/ISO directives